https://atp.directus.app/assets/dbb8638a-0e0f-4d51-a141-01762530cc0e.jpg?v=1305

Site Identity

AMS Microchip Plant

In just 11 months of construction, a microchip plant with an attached office building was built in the greater Graz area. We took new paths, both conceptually and in terms of the chosen planning process (Design-Build-Project).

All functional and production areas are combined by a silver dynamic cladding element, whose significant form has become the new identifier for the entire site. A structural special feature: The roof assembly was completed up to a watertight roof using large wooden panel elements (l x w = 14.5 x 2.5 m) in just two weeks.

Similar projects

Think Big – Think Sustainable

Corporate Headquarters for CERATIZIT Austria
Office and administration Production and logistics ATP Green Deal  

Urban Aesthetic for an Industrial Zone

Headquarters of the CURA COSMETICS GROUP
Office and administration ATP Green Deal Innsbruck  
https://atp.directus.app/assets/2c2b9ca7-6a7d-4771-8701-05859eb3dc73.jpg?v=1292

Campus for Innovation and Industry 4.0

Technology Center Seestadt in Vienna
Office and administration Design and Research Mixed use  

Follow us